Homeowner had a leak from their attic. After leak was repaired the lime plaster had to be removed from the walls then the walls had to be dried using target drying mats to target dry the wet area only and not to over dry the rest of the lime plaster throughout the property.
Afterwards the walls had to be plastered and period coving had to specially manufactured bringing the property back to pre-loss condition.